Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/zds/domains/space-place.zingdigitalservices.com/public_html/wp-includes/functions.php on line 6131

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/zds/domains/space-place.zingdigitalservices.com/public_html/wp-includes/functions.php on line 6131
The Weir 3G Indoor Hall  - Space & Place
Leisure
Sport

The Weir 3G Indoor Hall 

June 2014

SportScotland appointed SPACE&PLACE (S&P) to design a covered 3G synthetic pitch at their Inverclyde premises in Largs. The facility features a flexible layout adaptable to a 66m by 44m seven-a-side pitch or three five-a-side pitches. The 3G surface meets FIFA 2 Star requirements, ensuring high-quality performance for players.

The building is enclosed with a tensile fabric draped over a lightweight steel structure. This semi-translucent covering allows natural daylight to illuminate the playing area, reducing the need for artificial lighting and lowering the building’s carbon footprint. The lightweight tubular truss structure offers a clear height of over 11 meters, enhancing the sense of space and openness.

Amenities include 30 car parking spaces, restrooms, showers, and changing benches. Accessibility was a key consideration, with disabled parking bays close to the front entrance and level access throughout the building. Shower and WC facilities are equipped for both disabled and ambulant users.

Details

Cost: Confidential
Client: SportScotland
Completion: 2014

Facilities

66m by 44m 7-a-side pitch
5-a-side pitches
Car park
WC’s
Shower & changing benches

Similar Projects